Download User manual
Transcript
SECTION 4 - MACHINE OPERATION Raising and Lowering the Tower Boom Raising and Lowering the Main Boom This machine will have two controls for the tower boom (two toggle switches), one controls tower lift, the other tower telescope. The switching system will sequence its LIFT and TELESCOPE functions as follows: 1. Depress footswitch and sequence while RAISING the TOWER BOOM from the fully lowered position. To raise and lower Main Boom, depress footswitch, position MAIN LIFT controller to UP OR DOWN, and hold until desired height is reached. Telescoping the Main Boom a. The TOWER BOOM must be fully elevated “up” (approximately 12 degrees from vertical) before the TOWER BOOM can be extended from the fully retracted position. To extend or retract Main Boom, depress footswitch, position MAIN TELESCOPE control switch to IN or OUT, and hold until platform reaches desired position. b. The TOWER TELESCOPE “out” will only be operable when the TOWER BOOM is fully elevated “up”. 2. Depress footswitch and sequence while LOWERING the TOWER BOOM from the fully elevated “up” position. a. TOWER TELESCOPE “in”. The TOWER BOOM must be fully retracted before the TOWER BOOM can be lowered. b. TOWER BOOM lift “down” will only be operable when the TOWER BOOM is fully retracted. 3121209 – JLG Lift – 4-11