Download 2009 Version Manual - Mountain Instruments
Transcript
SECTION 1 SETTING UP THE MOUNT 1.1 Mounting the Base to the Pier After assembling the pier, the first step in setting up your MI-250 Go-To is to secure the RA assembly to the pier. Begin by removing the three bolts from the lower black anodized RA base assembly. These are the three bolts that will secure the base to the top of the pier. The pier has been marked with a with a north arrow. Turn the pier so that the arrow points north prior to mounting the RA assembly. The picture shows the Mountain Instruments MI-8P heavy-duty pier. Place the mount into the top of the pier and line up the holes. Snug down the three bolts. Do not force them to the point of stripping the threads. 1.2 Attaching the Dec Assembly The next step is to attach the German declination assembly to the RA assembly. The dec assembly is top heavy so before attaching the dec assembly, tighten the RA clutch screws. See the next section for clutch adjustment. Be sure to wipe off any debris that might be on the face of the polar shaft or the flat surface of the dec assembly prior to assembly. Locate the ½” center hole on the dec assembly. This hole is provided to register the center of the dec assembly onto the center stud of the polar shaft. It also steadies the dec assembly while securing the dec bolts. Do not rely on the center stud to hold the dec in place while fastening the dec bolts. Place the dec assembly onto the center stud and screw in the dec bolts. Insert each and partially screw down all the bolts before tightening any one bolt. Again, take care not to over-tighten any of the bolts as this will strip the threads; tighten just enough to provide a snug fit. After securing the dec bolts, screw the counter weight shaft into the dec assembly. Hand tighten the shaft to the point where there is no play in it.