Download DevLink-P200_Protocols converter

Transcript
JAYAK.420000.001-20 RE
CONTENTS
Page
INTRODUCTION____________________________________________________________ 5
LIST OF ABBREVIATIONS ___________________________________________________ 6
1
DEVICE APPLICATION ___________________________________________________ 7
2
TECHNICAL CHARACTERISTICS __________________________________________ 8
2.1
Overall dimensions __________________________________________________ 8
2.2
Processing core parameters __________________________________________ 8
2.3
Power supply parameters _____________________________________________ 8
2.4
Interface parameters _________________________________________________ 8
2.5
Environment requirements ____________________________________________ 8
2.6
Environment mechanical stability ______________________________________ 8
2.7
Safety _____________________________________________________________ 9
2.8
Reliability __________________________________________________________ 9
3
DELIVERY SET ________________________________________________________ 10
4
DESIGN AND OPERATION _______________________________________________ 11
4.1
Interfaces _________________________________________________________ 11
4.2 Device design and operating principle _________________________________ 11
4.2.1 General description ________________________________________________ 11
4.2.2 Single-board version of DevLink®-P200 ________________________________ 12
4.2.3 Double-board version of DevLink®-P200 _______________________________ 18
4.3
Operating modes ___________________________________________________ 22
5
INTERACTION WITH OTHER DEVICES_____________________________________ 22
6
MEASURING DEVICES AND ACCESSORIES ________________________________ 23
7
MARKING AND SEALING ________________________________________________ 23
8
PACKAGE ____________________________________________________________ 23
9
INTENDED USAGE _____________________________________________________ 23
9.1
Operating restrictions _______________________________________________ 23
9.2
Preparation for usage _______________________________________________ 23
9.3
Unpacking ________________________________________________________ 24
9.4
The product external inspection range and order ________________________ 24
9.5
Installation ________________________________________________________ 24
9.6
Preparation for operation ____________________________________________ 24
9.7
Dismounting_______________________________________________________ 25
9.8
Product use _______________________________________________________ 25
-3-