Download OPTime User`s Guide
Transcript
INTRODUCTION Preventive maintenance is defined as a planned strategy of cost-effective treatments applied to an existing roadway system that preserves the system, retards future deterioration, and maintains and improves the functional condition of the system (without substantially increasing structural capacity) (1). Although many agencies have implemented preventive maintenance programs, there is still very little available guidance on determining the optimal timing of such treatments. The analysis tool developed for this project is intended to bridge that gap by implementing a methodology for calculating optimal timing. Although the analysis tool does not use a true optimization strategy (i.e., all possible treatment application times are not analyzed), it does provide a simple method for choosing the most effective treatment timing from a set of performance and cost data reflecting the application of a preventive maintenance treatment applied at different pavement ages. This User’s Guide is a hands-on introduction to using the macro-driven Microsoft® Excelbased analysis tool (OPTime) that was developed under National Cooperative Highway Research Program (NCHRP) project 14-14, “Guide for Optimal Timing of Pavement Preventive Maintenance Treatment Applications.” It is not intended to answer all questions about the underlying analysis approach, as the analysis approach is described in much greater detail in chapter 3 of the main report. However, it does provide detailed information organized into the following five areas: Analysis tool capabilities—This section describes the capabilities and intended use of the OPTime analysis tool. Key concepts of the methodology—For quick reference, this section summarizes many of the important terms that are encountered during the setup and conduct of an analysis session. C-2