Download LCW - LCR

Transcript
LCW - LCR
TABLE OF CONTENTS
GENERALITIES
INSPECTION, CONVEYANCE, SITING
Inspection
Lifting and conveyance
Unpacking
Siting
INSTALLATION
Installation clearance requirements
General guidelines for plumbing connections
Water connection to the evaporator
Instructions for the filling up of the rank
Safety valve drain pipes
Electrical connections
Generalities
Remote controls
Split unit installation
STARTING UP
Preliminary checks
Starting up instructions
Starting operation
Checks during operation
Checking the refrigerant level
Stopping the unit
RG66001652_REV.02
2