Download Pollutant Load Reduction Model (PLRM)

Transcript
PLRM v1 Database Refinement: FINAL Phase II Monitoring Plan p. 26 Blue Lakes Basin (Dry Basin) [Figure 2.9] Blue Lakes Basin monitoring will include event‐based surface water sample collection, surface water hydrology monitoring and SWT condition evaluations. The Blue Lakes Basin was selected because it has a classic design that allows for easy instrumentation and monitoring, is unlikely to have significant groundwater impacts on infiltration, and is in close proximity to the basins already instrumented for 2NDNATURE (2009b) monitoring (see Figure 2.5). The Blue Lakes Basin watershed will be characterized as part of this Monitoring Study and include area, land use characterization, and % impervious. The Blue Lakes Basin was constructed in 2005 as part of the Sierra Tract Phase 2 Erosion Control Project. The key design parameters of the dry basin will be derived using Sierra Tract Phase 2 construction documents and a reconnaissance survey of the dry basin. Eloise Basin (Dry Basin) [Figure 2.10] Eloise Basin monitoring will include surface water hydrology monitoring and SWT condition evaluations. Eloise Basin was selected for sampling due to the research team’s familiarity with the site, existing infrastructure to house instrumentation, and the close proximity to 2NDNATURE (2009b) monitoring locations (see Figure 2.5). Eloise Basin was the monitored from November 2001 to December 2005 as part of two sequential event‐based and seasonal hydrologic and water quality monitoring studies conducted by 2NDNATURE personnel for Tahoe Regional Planning Agency (TRPA) and South Tahoe Public Utility District (STPUD). Flow meters and automated samplers were installed at the inlet and outlet from 2001 to 2003; however, backwatering conditions at the inlet made the instrument of limited benefit. Pressure transducers were installed intermittently from 2001 through 2005 to develop basin volume time series and determine outflow frequency, duration and volumes. All instrumentation was removed in December 2005. Given the research team’s knowledge of the site and the existing infrastructure, instrumenting and monitoring Eloise Basin will be relatively efficient. Wildwood North Basin (Dry Basin) [Figure 2.11] Wildwood North Basin monitoring will include surface water hydrology monitoring and SWT condition evaluations. The Wildwood North Basin was selected for monitoring due to the significant volume of runoff routed to it, the relative unlikelihood that local groundwater will significantly impact the basin’s infiltration capability, and its proximity to the previously instrumented 2NDNATURE (2009b) SWTs (see Figure 2.5). Wildwood Basin has been previously monitored by CSLT and receives runoff from at least 3 separate catchments, including one inlet that receives runoff directly from Highway 50, a primary high risk road (PHR) maintained by Caltrans. Coon Basin (Dry Basin) [Figure 2.12] Coon Basin monitoring will include surface water hydrology monitoring and SWT condition evaluations. Coon Basin has been previously surveyed by DRI and the research team will use this existing data to develop the stage to storage volume rating curve for the dry basin SWT. Additionally, Coon Basin can provide information concerning treatment performance factors outside of the south shore of Lake Tahoe. 2NDNATURE, LLC
500 Seabright Avenue Suite 205 Santa Cruz CA 95062 p 831.426.9119 w 2ndnaturellc.com