Download 6 - GE Intelligent Platforms: Support Home

Transcript
6
After pressing the [Y] key to continue, the ADS software installation process will
commence. If you previously executed a demonstration system as outlined in Chapter 5,
this process will complete very quickly; otherwise, several minutes will be required to
complete the installation. While PCOP is loading files to the ADC module, the port 1
LED on the module should be blinking and the message ”Loading File to PCM” should
be displayed on your computer screen. When the installation is completed you should
see the following screen on your computer’s display,
and this display on your target terminal. The error message ”Error opening system
configuration file RAM:TUTOR.CFG” means that the ADS Executor did not find the
TUTOR system on the ADC module’s RAM: disk; this is OK since we haven’t created the
system yet!
GFK-0499
Chapter 6 Development Tutorial - Creating Your First Operator Interface System
6-7