Download Parameterization Workbook (pdf version)
Transcript
4. MINERAL INITIAL PARAMETERS -2 minerl(1..n,1) These set the initial N (g m ) in each soil layer. If you have no data or estimates for this use 1 for the layers that include the top 20 cm of soil. minerl(1..n,2) These set the initial P (g m-2) in each soil layer. If you have no data or estimates for this use 1 for the layers that include the top 20 cm of soil. minerl(1..n,3) These set the initial S (g m-2) in each soil layer. If you have no data or estimates for this use 1 for the layers that include the top 20 cm of soil. 5. WATER INITIAL PARAMETERS This is not necessary if you include an equilibrium block in your schedule file. But if you want to include precise initial conditions then enter measured or estimated values for: rwcf(1..n) These parameters set the initial relative water content (RWC) for each soil layer. RWC = (W - WP)/(FC – WP) where W is the measured soil water content, WP is the soil water content at wilting point and FC is the soil water content at field capacity. snlq is the liquid water in the snowpack (cm H2O) snow is the snowpack water content (cm H2O) 6. OTHER PARAMETERS Check the parameters listed below and be sure they are set to the indicated values: w1lig = 0.0 w2lig = 0.0 w3lig = 0.0