Download - D-Link
Transcript
DGS-6600 Layer 3 Chassis Ethernet Managed Switch Hardware Installation Guide Chapter 2 Installation Installation Site Requirements System Grounding Requirements Installation Tool Requirements Inspection Requirements when Unpacking the Switch Installation Flowchart Verifying the Installation Installing the Cabinet Mounting the DGS-6600 Series Switch into the Cabinet Fan Tray Installation Power Supply Installation Air Filter Installation System Ground Connection Connecting the AC Power Supply to the Power Module Connecting the Management Module Cable Removing Line Cards from the DGS-6600 Series Switch Installing Line Cards in the DGS-6600 Series Switch Connecting the External Interface Cables Cable Management Installation Checks Installation Site Requirements The DGS-6600 series switch should be used indoors. To ensure normal operating conditions and prolong the life of the Switch, the following conditions should be met. Rack Mounting Requirements If rack mounting the DGS-6600 series switch, the rack mounting should meet the following requisites: • Try to install the Switch in an open cabinet. If the Switch is installed in a closed cabinet, ensure that the cabinet has good ventilation and good heat dissipation system. • Ensure that the cabinet is both stable and strong enough to support the weight of the DGS-6604 or DGS-6608 chassis and its installed components. • Ensure that the cabinet dimensions allow enough space for installation of the front, rear, left and right panels of the DGS-6604 or DGS-6608 Switch. • Ensure that the cabinet is properly grounded. 33