Download coen-2003-project-27.. - Computer Engineering

Transcript
Figure 9: Control Box Flow Chart
This is the control box flow chart. The program interacts with the database and
reacts to the information. It checks the database at specified intervals to do different
tasks and create a todo object which is then executed and sent out through the
serialIO thread and inserted into the response queue.
3.1
Operating System
The central control box will be powered by Microsoft Windows 2000
server, which will in turn run the program that allows the system to
function. Windows Server is a well-defined operating system that is
compatible with many sets of hardware including the one that we have