Download PDF
Transcript
CONNECTIVE DIAGRAM 5.5TR INDOOR UNIT INSTALLATION 8.75TR ? Installation Space:Ensure enough space required for installation and maintenance. Over 500 mm Gas side Liquid side Maintenance space Orifice £ Note: Over 600 mm Fig.30 600mmX600mm For ensuring throttled efficiency. Please mount the Orifice as horizontally as possible; and anti-shock rubber should be wrapped at external of the Orifice for denoise. Inspection orifice Fig.32 £ Caution:£ Mark the data plate with the Orifice installed. £ Please purchase the fittings according to the requirements in the manual strictly. £ Refer the diagram when installing. Liquid side Liquid side Liquid side Outdoor Indoor Outdoor Indoor Note: Ensure that the minimum Outdoor Indoor drain gradient is over 1/100. Inspection orifice X Fig. 31 Fig.33 ? Install Φ10 Pendant Bolts or Ground Bolts:- £ Preinstalled Orifice: Pendant bolt hole 4-12×72 Cooling only Cooling &Heating 3-PHASE 117 / 760 D10191A1 50Hz 840 800 MODEL ORIFICE PHASE Fig.34 Air inlet side 1180 (Unit:mm) 35 36