completeness. The only two factors that Aitne Inc. pledges to not pursue are the
factor for hardware design, development, and test and intellectual property
protection. Since the product is being developed for Aitne Inc. itself, the
company has decided not to partake in IP protection. The hardware of Aureole
will be based on a reference design and does not qualify as hardware design.
However, the other factors of technical merit have specific reasons and
explanations that detail why they are being accounted for in Project Aureole.
1. Contains a clearly described and completely understood technical challenge
Aitne Inc. recognizes three different challenges that must be overcome in order
for the device to be considered functionally complete. The first challenge is that
the Aureole device must be able to stream 360O, un-wrapped panorama video
streams. The second challenge is that the client applications must be able to
receive video streams from an RTP server. The third and final challenge is that
both the Aureole device and the Aureole conference client software are able
to connect to each other and deliver the Virtual Presence experience to the
user. Project Aureole receives 0.1 points for this factor.
2. Contains a requirement for system integration
The Aureole conferencing device and client software must be able to
demonstrate full integration with the hardware, software, and network systems
to which they are deployed on. They also must integrate into various mobile
environments and situations in order to prove that the device and client
software is in-fact the ultimate mobile conferencing system. Project Aureole
receives 0.2 points for this factor.
3. Contains a requirement for system testing
Before the Aureole device and client software can be demonstrated to stake
holders, both the hardware and software systems must pass an array of
functional, validation, and characterization tests. This will ensure that every