Download - Engineered Air
Transcript
Troubleshooting Hardware Installation Inspection Once the mechanical contractor starts receiving delivery of the UNTs with factory mounted controls, we recommend that arrangements be made to pull a sample of the shipment for bench testing. This can be done by loading a job configuration before all the controllers are mounted in the unit cabinets. Tools Needed for Troubleshooting Tools needed for typical troubleshooting include: • ASC and N2 Bus Networking and Troubleshooting Guide Technical Bulletin (LIT-6363003) • Digital Multimeter (DMM) • 100k ohm resistor • (optional) Double banana plug (see Figure 34; available from a local electronics store or ITT Pomona Stock No. 34F856 or 34F845), 100k ohm 1/4-watt resistor for earth ground voltage tests 100k ohm, 1/4-watt Use double banana plug for all tests that require a 100k ohm resistor placed in parallel with DMM. Steps: 1. Connect 100k ohm resistor under plug's prongs. 2. Insert banana plug into DMM. 3. Connect leads of DMM into banana plug. banana Figure 34: Double Banana Plug Used with 100k ohm Resistor Installation Checkout Review the mounted UNT and compare it with the appropriate illustrations in the Installation Procedures section of this technical bulletin to ensure proper installation. Also refer to the engineering drawings supplied for the individual site. 1. Ensure that the mounting screws holding the subassembly onto the base frame are secure. 2. Ensure that accessory equipment is connected and labeled correctly. 3. Ensure that the controller terminal connections are secure. 4. Ensure that the N2 connections are secure and labeled correctly. 5. Ensure that the UNT switches are appropriately positioned. (Refer to the Wiring Details and Networking the Controller sections of this technical document.) 6. Ensure that there are no unwanted earth ground connections to the controller. UNT Controller—Unitary Controller (UNT) 61