Download 200_IDB_UserGuide
Transcript
200 & IDB SERIES INLINE DUCT BLOWERS FIGURE 2 HVAC PRODUC S BELT ALIGNMENT FIGURE 3 BEARING REPLACEMENT ELECTRICAL WARNING ENSURE POWER SUPPLY IS DISCONNECTED & LOCKED OUT PRIOR TO MAKING ELECTRICAL CONNECTIONS. Before connecting the motor to the electrical supply, check the electrical characteristics and wiring instructions as indicated on the motor nameplate or inside the conduit box cover to ensure proper voltage and phase. Complete electrical connections as indicated. WARNING A GROUND WIRE MUST BE CONNECTED FROM THE MOTOR HOUSING TO A SUITABLE ELECTRICAL GROUND. OPERATION 1. Complete the electrical connections, energize the unit momentarily and ensure proper wheel rotation. (see Fig, 1). 2. Apply full power. 3. With all ducts attached, the access doors in place and the air system in full operation, measure the motor current and ensure that it is less than the rated full load motor amperage as indicated on the motor nameplate. MAINTENANCE WARNING ENSURE POWER SUPPLY IS DISCONNECTED & LOCKED OUT PRIOR TO MAKING ELECTRICAL CONNECTIONS. 1. Inspect and tighten all bearing collar and wheel set screws after the first 50 to 100 hours of operation and periodically thereafter. 2. Follow motor manufacturer's instructions for motor lubrication. Remove any excess lubrication. 3. Check the drives. a. Tighten set screws on pulleys, wheel and bearing locking collars. b. Check belt tension and alignment. c. Replace cracked or worn belts. 4. Blower bearings are permanently lubricated and require no further lubrication. 5. Inspect V-belts for wear and proper tension. If it is necessary to replace one belt on a multiple belt drive, replace all the belts with a matched set. Do not use belt dressing. 6. Clean the blower wheel periodically. Material build up on the blades can cause wheel imbalance which may result in wheel or bearing failure. 7. To reinstall replacement ball bearings press the locking collar against the inner ring of the bearing and turn in the direction of the shaft rotation until engaged. Insert a drift pin into the pin hole and tap lightly to set. Tighten set screw on locking collar firmly (see Fig. 3). 8. Should further service to the blower be necessary, refer to the exploded view illustration (see Fig. 4). 200_IDB-M-04_16_13 Page 3 of 4