Download Installation Manual

Transcript
1.0 TECHNICAL DATA
1.1 Air Distribution (Normal Operation)
STALE AIR
TO OUTSIDE
FRESH AIR
TO BUILDING
STALE AIR
FROM BUILDING
FRESH AIR
FROM OUTSIDE
VF0022
1.2 Air Distribution (Defrost)
FILTERED AIR
TO BUILDING
STALE AIR
FROM BUILDING
VF0023
Outside Temperature
Celsius (°C)
-5
-15
-30
Fahrenheit (°F)
23
5
-22
Defrost Cycles
Extended Defrost Cycles*
Defrosting (min.) Operation time (min.) Defrosting (min.) Operation time (min.)
between each defrost cycle
6
6
6
32
32
20
between each defrost cycle
10
10
10
30
20
15
* In a cold region, setup EXTENDED DEFROST by removing jumper JU1F
on the circuit board.
1.3 Dimensions
6" (152 mm)
30 1/4" (768 mm)
17 1/8" (435 mm)
16 1/2"
(419 mm)
VK0029
3