1. Start Up Guide
1.1 Blender Power Up
Connect power to the blender as per the
electrical wiring diagrams (Please read the
safety information in the introduction section for
warnings and the maintenance
Check that the operator display is showing the
home screen as shown in Fig 1.
The blender range is designed to allow easy
operation for operators of all nationalities.
1.2 Weight hopper Calibration.
Fig 1 Production Summary
The most important factor regarding the blender is the weighing system. It is very important that
the weighing is correctly calibrated and is operating correctly.
Firstly ensure that there is nothing touching the load cell bracket
Ensure that weigh hopper
mounting bracket is not
touching the frame of the
blender.
PLC Start up Rev 1.1