Download Metering Protocol Appendicies
Transcript
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III 6 • Primary bypass protector • Sliding CT shorting link • Four 7/8”x 2-3/8” mounting slots • Four 1” eyebolts on base for four-point lifting sling • 1/4” threaded stud secondary terminals • Two conduit boxes, each with three 1-1/2” knockout Original Sheet No. 1078 Testing The ISO Metered Entity shall ensure that, before shipment, each transformer is subjected to testing as prescribed by recognized industry standards and other tests including: (a) Applied voltage test for primary and secondary winding withstand to ground; (b) Induced voltage test for proper turn-to-turn insulation; (c) Accuracy test for ratio correction factor and phase-angle verification to confirm 0.3% metering accuracy per recognized industry standards; (d) Ratio test; (e) Insulation Power Factor test; (f) Polarity test; (g) Leak test to assure integrity of gaskets and seals; and (h) Partial Discharge Test may be done in conjunction with applied voltage testing to assure proper line-to-ground withstand. The tests shall be submitted to the ISO on a formal certified test report. 7 Required Information The following drawings and information shall be required: (a) 3 sets of drawings showing physical dimensions including mounting holes and primary CT terminal details, nameplate. The ISO Metered Entity shall ensure that it receives a schematic of connections from its supplier; and (b) a copy of quality controls/quality assurance (QC/QA) manuals applicable to production of the transformer(s). Issued by: N. Beth Emery, General Counsel and Vice President Issued on: June 1, 1998 Effective: March 31, 1998