SECTION 01 11 00 – SUMMARY OF WORK
1. Page 00 11 00-4. After Paragraph 1.02.B.5, Add Paragraph 1.02.B.6 as follows:
6. Alternate No. 5 – Alternate Control Systems Manufacturer Deduct
a.
At the option of the Bidder provide a price deduct to replace Base Bid Control
Systems Manufacturer with Alternate Controls System Manufacturer. Only
acceptable alternate controls systems manufacturers are listed in Section 40 91
10 – Control Panels.
2. Page 00 11 00-5. After Paragraph 1.06.A.5.b., Add Paragraph 1.06.A.6. as follows
6. Alternate No. 5 – Alternate Control Systems Manufacturer Deduct
a.
Specifications: Section 40 91 10
b.
Drawings: EC1 through EC33
SECTION 01 23 00 – CONTRACT CONSIDERATIONS AND ALTERNATES
2. Page 01 23 00-4. After Paragraph 1.04.A.4, Add Paragraph 1.04.A.5 as follows:
5. Alternate No. 5 – Alternate Control Systems Manufacturer Deduct
a.
At the option of the Bidder provide a price deduct to replace Base Bid Control
Systems Manufacturer with Alternate Controls System Manufacturer. Only
acceptable alternate controls systems manufacturers are listed in Section 40 91
10 – Control Panels.
SECTION 02 51 10 – LIME POND DECOMMISSIONING
1. Page 02 51 10-4. Add the following text to Paragraph 3.03:
F.
Contractor shall be responsible for providing chemical acid for pH adjustment of
decant water in accordance with permitted discharge requirements.
SECTION 07 14 00 - ELASTOMERIC MEMBRANE ROOFING
1. Page 07 14 00-2. Add the following manufacturer data to Paragraph 2.01.A.2: Tremco
TP260.
SECTION 07 53 00 – ELASTOMERIC MEMBRANE ROOFING
2. Page 07 53 00-3. Add the following manufacturer data to Paragraph 2.01.B.5: Versico.
SECTION 08 17 43 - FRP FLUSH DOORS
1. Page 08 17 43-5. Add the following manufacturer data to Paragraph 2.01.A.2: Simon Door.
SECTION 08 44 13 – GLAZED ALUMINUM CURTAIN WALLS
1. Add attached specification section.
2. 8" mullion sections shall be 2, 4-inch mullions
Water Treatment Plant
May 20, 2011
AD2 - 3
Fairmont, Minnesota
P05194-2008-00