Download A User`s Guide to EnergyPLAN
Transcript
A USER’S GUIDE TO ENERGYPLAN April 13, 2010 The distribution is simply adjusted to reflect the total annual production/demand. For example, in Figure 2, the distributions for three separate demands are shown. In Figure 2 the three distributions show how the distribution in Figure 1 is manipulated to model the total demand. Table 1 How a distribution is indexed and subsequently used in EnergyPLAN (Note: 8784 hours in total are required). Time (h) 1 2 3 4 5 6 Output from a 100 MW Wind Farm (MW) 20 30 60 100 80 40 Index Data Fraction Decimal 20/100 0.2 30/100 0.3 60/100 0.6 100/100 1.0 80/100 0.8 40/100 0.4 Using Indexed Data to Simulate a 400 MW Wind Farm 0.2*400 80 0.3*400 120 0.6*400 240 1.0*400 400 0.8*400 320 0.4*400 160 Figure 1: Distribution of Irish Electricity‐Demand for January 2007. Figure 2: Distribution modified by the total demand required. 3.1 Data for a Reference Model with a Technical Optimisation EnergyPLAN simulates a single year in hourly time‐steps. To create an initial model, I picked the year 2007 as it was the most recent when I started gathering my data. University of Limerick | Collecting the Required Data 5