Download Instruction Manual
Transcript
ETR-4000 IM02602004E Commissioning: Current Transformer Failure Supervision Precondition: 1.Measurement of all three-phase currents (are applied to the measuring inputs of the device). 2.The ground current is detected via a zero sequence transformer (not in residual connection). Object to Be Tested: Check of the CT Supervision (by comparing the calculated with the measured ground current). Necessary Means: Three-phase current source. Procedure, Part 1: •Set the limiting value of the CTs to »delta I=0.1*In«. •Feed a three-phase, symmetrical current system (approx. nominal current) to the secondary side. •Disconnect the current of one phase from one of the measuring inputs (the symmetrical feeding at the secondary side has to be maintained). •Make sure that the »CTS.ALARM« signal is generated. Successful Test Result, Part 1: The »CTS.ALARM« signal is generated. Procedure, Part 2: • Feed a three-phase, symmetrical current system (approx. nominal current) to the secondary side. • Feed a current that is higher than the threshold value for the measuring circuit supervision to the ground current measuring input. • Make sure that the »CTS.ALARM« signal is generated. Successful Test Result, Part 2: The »CTS.ALARM« signal is generated. www.eaton.com 539
Related documents
MRA4 HighPROTEC
Eton 4000 Plus Instruction manual
MRA4 HighPROTEC - DSF Technologies
SonicWALL TZ 170 10 Node with Comprehensive Gateway Security
SonicWALL TZ 170 10 Node
Metering Devices, Protective Relays, Software and Connectivity
User Manual - Neri Group
Advanced Modular Calibrator DPI 620 Brochure - Cole
Advanced Modular Calibrator and HART
SE-AM-19 - Declaration Account Submission via eFiling
RL-H2Sa
RL-H1Sa - GeoShack