Download KUKDONG
Transcript
G KUKDONG HOIST CO., LTD. KUKDONG HOIST CO., LTD. KUKDONG HOIST CO., LTD. KUKDONG HOIST CO., LTD. KUKDONG HOIST CO., LTD. KUKDONG HOIST CO., LTD. KUKDONG HOIST CO., LTD. ΈͲͿͺͿ (1) Installation, maintenance and repairing of hoist must be executed by a qualified person or a trained engineer under safety instruction. (2) You must keep the notice to safety on user’s manual to prevent from potential danger for sure. (3) Please do an earth according to the related specification before turn power on. It could be caused danger of electric shock if wires would be changed or would not connect an earth. (4) Please do not modify control circuit on purpose. Besides, please do not bend or pull power cable or lead wire strongly. It could be caused danger of fire, electric shock or any error. (5) Please do not touch hoist body with the body or any materials. It could be got severe human injury. (6) Please do not exceed the rated lifting length. Even if hoist has extra length 1-1.5m, it could be caused a serious problem of product as you exceed the rated lifting length frequently. (7) Please make sure the following notice when you hang up the load or any freight. - You must know the weight of load as correct as you know. - Please make a sure the center of balance of the load as the load has a various shape. - Please do use suitable and safe tools for the load and shape. - Please make angle within 60° when you use wire rope or chain. The more angles are, the more tension of chain is. - Please do not hang up the load with one fall. To be taken center of the load is very difficult and the load is biased. - Please do select rope or chain or assistant tools according to weight of the load. To be used thick rope against light weight is very dangerous conversely. - Please do not suspend the end of hook. The center of hook is stronger than other part. Biased makes weak and it is very dangerous as the strength of end of hook is about 40%. (8) Please do release or remove or transform the function of limit switch device, overload protector, emergency stop device, traversing limit switch device, safety latch device of hook or crash stop these devices from hoist. (9) Installation, maintenance and repairing of hoist must be executed by a qualified person or a trained engineer under safety instruction. (10) Please do not modify spare parts or components. We are not responsible for serious damage or human injury by these behaviors. (11) You must turn power off before maintenance and inspection and set up the sign of warning. It could be damaged by unwanted operation or electric shock. ʹͲΆ΅ͺͿ (1) Please prepare for reasonable protection procedure to prevent from unexpected accident by a unqualified person(the elder, the disable, children etc). (2) Unsuitable person related to operation(a drunken person, a medicine taker) must not do any working like installation, operation and maintenance etc. (3) Please do use suitable and safe tools for load and shape after checking of weight of load. (4) A excessive voltage alteration(over ±10%) and frequency alteration(over ±5%) is caused a shortage of torque and overheating. Besides, if the length of cable becomes long, voltage dropping is serious. So, please keep within 2% of voltage dropping. (5) Please do appoint a manager in charge of hoist to prevent from unexpected accident or troubles. G http://www.kdhoist.comG G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G TGYGTG