Download Manual - Magnum Dimensions
Transcript
Installation 2.7 Inverter Notification Requirements When an inverter is installed in a building, facility or structure, the NEC (National Electrical Code) requires a label or plaque to be provided. This label/plaque is required to be easily visible and provide information that informs personnel on the location of all electrical system disconnects. This is to ensure all power to a building is quickly located and shut down in an emergency. There are also specific requirements for this label/plaque depending on the inverter application, they are as follows. 2.7.1 Facilities with Standalone Systems Any building, facility, or structure with a photovoltaic power system that is not connected to a utility service source and is a standalone system must have a permanent plaque or directory installed on the exterior of the building or structure at a readily visible location acceptable to the Authority Having Jurisdiction (AHJ). The plaque or directory must provide the location of system disconnecting means and information regarding whether the structure contains a standalone electrical power system. 2.7.2 Facilities with Utility Services and PV Systems Buildings, facilities, or structures with both utility service and a photovoltaic system must have a permanent plaque or directory providing the location of the service disconnecting means and the photovoltaic system disconnecting means if they are not located at the same location. 2.7.3 Inverter Warning Label A warning label as shown in Figure 2-24 is provided to inform all personnel that an inverter is installed in your electrical system. Affix this label in a clearly visible location at the electrical panel that is being powered by the inverter. This is because it might be falsely assumed that the panel is no longer “hot” after the AC power has been shut off, when power may actually still be available due to the inverter automatically powering the panel. This electrical system is equipped with an Automatic Generator Starting (AGS) device and/or an inverter. Disconnect all AC and DC power to the AGS and/ or inverter before performing any service to the electrical system. Failure to do so can result in shock causing serious injury or death. PN: 62-0002 Rev A Figure 2-24, Warning Label 2.8 Final Inspection 1. Verify all cables/conduit runs are secured with wire ties or other non-conductive fasteners to prevent chafing or damage from movement and vibration. 2. Verify strain reliefs or grommets are in place to prevent damage to the wiring or conduit where it passes through walls, bulkheads, or other openings. 3. Verify all AC connections are correct and torqued to a maximum of 16 in lbf (1.8 N-m). 4. Replace the covers on the main electrical/distribution panel. 5. Replace the chassis access cover. 6. Verify the inverter’s front panel switch is in the “OFF” position. Info: If required by code, have the installation inspected by an electrical inspector. Page 41 © 2012 Magnum Energy, Inc.