Download K. Fowler (CRC, 2008) BBS - Web server administration

Transcript
Developing Real-Time Embedded Products
234
4.2.2. Iteration Objectives
4.2.3. Releases
4.2.4. Project Schedule
4.2.5. Project Resources
4.2.6. Budget
4.3. Iteration Plans
4.4. Project Monitoring and Control
4.4.1. Requirements Management Plan
4.4.2. Schedule Control Plan
4.4.3. Budget Control Plan
4.4.4. Quality Control Plan
4.4.5. Approval, Distribution, and Archiving Plan
4.5. Risk Management Plan
4.5.1. Project Risk Management
4.5.2. Fault Tree Analysis (FTA)
4.5.3. Failure Modes and Effects Analysis (FMEA)
4.5.4. Margin Management
4.6. Close-out Plan
5. System Specification and Performance Verification
5.1. Requirements and Requirement Flow Down
5.2. Technical Performance Standards
5.3. Interface Definition and Control
5.4. Configuration Management and Change Tracking
5.5. System Validation
5.6. Performance Verification
5.7. Technical Performance Trending
5.8. System-Level Design Guidelines
6. Independent Reviews
6.1. Peer Reviews Requirements
6.2. Formal Reviews
6.3. Action Item Management
7. Documentation Plan
8. System Architecture Development Process
8.1. Overview
8.2. Management and Staffing
8.3. Schedule and Iteration Plans
8.4. Design Inputs, Design Outputs, and Documents Required