Download AAR Intermodal Interchange Rules
Transcript
AAR Intermodal Interchange Rules APPENDIX B CORRECT UNIT REPAIR PROCEDURES (b) Remove any attachments (ventilators, marking plates, etc.) that are within the damaged area or near enough that they may be damaged during repair. (c) Mark and cut out the damaged area with a torch or cutting disc. Cut the replacement material to size. Inserts must be fitted flush with the existing panel and should be fabricated to allow no more than 2 mm (5/64 in.) clearance between adjoining surfaces. Panel insert material must have the same corrugation size, profile, and radii as the original panel. (d) Fit the insert into the cut-out area and tack-weld in position. Continuously weld the insert on the exterior side of the existing panels. Ensure that insert welds fully penetrate the panel to the interior side. (e) Clean, mask, and prime the repaired area on both exterior and interior sides. Apply top coat to the exterior side only. (f) Replace markings removed during repair that are required by regulation or as directed by the owner. Reattach any other components that were removed during the repair. d. Panel Replacement of Sheet and Post Trailers and Containers (1) Sufficient panel lap is required to provide both a good seal and proper installation (see Figure B-3). Figure B-3 Panel Overlay (2) Place the panel over the opening and drill around the panel perimeter, placing the holes on 1½ inch centers. If an existing rivet hole is used, it must be reamed to provide a tight fit by use of a larger size rivet. (3) The placement area and existing adjacent panels must be cleaned and deburred where they lap. (4) Use applicable aluminum alloy or high tensile cadmium-plated steel rivets. –80– 1/1/2014