Download 2007 as pdf
Transcript
CALICE eLogbook - Results for search of: 20070601 14 15 16 16 17 18 1 3 4 17 18 19 20 21 22 23 24 25 26 27 32 33 34 35 36 37 38 19 20 21 22 23 25 26 27 28 29 30 31 32 33 34 35 37 38 1 4 3 2 4 3 2 1 2 1 3 1 2 3 4 3 2 1 Page 3 of 19 ok B-cable broken A-cable broken, HAB 6 coherent noise B-cable broken B-cable broken ok ok, HAB 4 coherent noise ok, HAB 2 coherent noise ok A-cable broken ok ok ok A-cable broken ok B-cable broken ok ok, HAB 6 coherent noise ok ok, HAB 8 coherent noise ok, HAB 1 coherent noise This test was done with the _DESY_ test-beam DAQ and a protype CRC in slot 12. 2007-06-17 16:32 Erika repair work AHCAL LV/HV distribution to modules checked. works fine. All LV/HV cables repaired. All installed modules are powered and tested. 8 modules at CERN + 4 modules at DESY are missing. A total of 15 SCSI cables have to be exchanged for the AHCAL. 2007-06-20 09:53 > [Fwd: caliceserv - lcio and root installed] Dear Colleagues, I have installed root (v5.14.00f) and lcio (v01-08-02) on caliceserv . root has been configured in the following way: ./configure --disable-rfio --disable-castor --disable-dcache --disable-gfal The machine can be freely used. I will announce times when I need it for test purposes. Cheers, Roman I should add that root can be found via $ROOTSYS and LCIO via $LCIO. The .bin files are visible via /mnt/data00 (01) 2007-06-20 11:02 Beni calice00 login problems The reason for the calice00 login problems was most probably a full root partition. Someone saved hughe software archives in / and /root. Please, use a different location for software installation in future. I moved some data from this places to /srv/calice/data01/root_bk. If you miss something look there first. I still have some problems to get the system back online. I will edit this entry if the system is back. EDIT: Computer is back online. For security reasons the root password was changed. 2007-06-21 13:41 Doerte David assembling status All cassettes are assembled! SiPMs for module # 24 and 36 are exchanged. Module 2 has one half with new the other half with old SiPMs/tiles. Module 1 has a pure mix of old SiPMs. All were tested, all are working but not with best conditions. Hopefully it will be ok as long as necessary. Shipment to CERN will be next Wednesday by our colleagues.