Download - Yokogawa
Transcript
5.5 Wiring Check Function WARNING • It is important to check the wiring for correct and safe measurement. Check the wiring with reference to Chapter 3, “Precautions for Safe Measurement,” Section 5.1, “Precautions for Wiring the Circuit under Test,” and Section 5.3, “Wiring the Circuit under Test with External VT/ CT.” • Check the connections of voltage probes, and for clamp-on current probes, check the models (ratings), H/L polarities of the plugs and jacks, and the arrow symbols on the clamps corresponding to the source-to-load directions of the circuit. • Do not use a clamp-on current probe with any non-insulated conductor. ● Check Items The following items are checked and judged, and then the result of each check item will be displayed as shown on the next page. For each voltage input: 1. Existence of input voltages 2. Frequency detection 3. Voltage phase sequence For each current input: 1. Existence of input currents 2. Clamp directions NOTE • Measurement is not performed during the wiring check. • The wiring check cannot be carried out during continuous measurement. 5-6 IM CW120-E