Download WaPUG River Modelling Guide
Transcript
WaPUG River Modelling Guide Version W01 November 1999 3) CSO inputs locations 4) Background mapping if possible 5) Weirs and other important structures 6) Tributaries and lateral inputs 7) Monitoring locations. All information should be stored electronically to enable easy transfer to modelling software, a GIS or CAD system. In general the modelling systems will be able to hold all the data, but the other systems may be necessary to improve data visibility and presentation. If for any reason co-ordinate data is not available for cross sections then schematic drawings should be produced. 4.3 Asset Data Asset data is the term used to describe the cross section data and all of the hydraulic controls in a watercourse. 4.3.1 Data Input CROSS-SECTIONS Where existing survey data is available, the cross sections to be included in the model need to be selected carefully. Too many cross sections, too close together can cause stability problems and will reduce model run times. There is more leeway to use fewer sections in a water quality model than a flood defence model because precise knowledge of water levels is not so critical. It is satisfactory to have enough sections to generally represent the overall shape of a channel. WEIRS Models handle weirs in two ways. The first method is to feed weir width versus level into the model. This is used in the broad crested weir equation to develop a flow / head relationship. The second approach is to use the “special weir” representation to provide a stage discharge relationship. For example in Mike 11 Version 3 these values are entered through the Mike 11 interface, whereas in Version 4 the data can be directly pasted in from a spreadsheet. To develop a broad crested weir model, data are required in two columns the first containing level information and the second weir width at that level. In cases where the weir is wider than the upstream and downstream cross sections the software is unable to generate a stage discharge relationship. In these cases the special weir approach is required or the weir will need to be narrowed and weir coefficients altered to satisfy the requirements of the WaPUG Page 22 of 38