Download User`s Manual
Transcript
GZF9003-VIF Wireless Repeater User’s Manual and arranging the entrance of the transportation equipment, entrance permits of all persons, water and power for construction, communication with Party A concerning the arrangement for construction, also responsible for logistics. He is responsible for chief engineer. Material Manager: keep and control the material during the construction. Coordinate, control and distribute all materials for construction. Buy the material and solve the problem of urgent needs of the materials. He must manage the material in good order. 2. Progress of Construction To assure the progress of construction, a reasonable arrangement for progress of construction must be made to ensure an orderly construction. In the course of construction, it is required that progress of construction must be controlled with good follow-up in addition to strict and reasonable arrangement of the progress of construction. 3. Predict, analysis and solutions on key and difficult issues in various phases of construction Predict and analyze possible key and difficult issues in various phases of construction before start of construction and provide solutions. In case of any alterations in the construction, they must be analyzed for feasibility under the supervision of engineering supervisor based on the “ Sheet for Alteration of Engineering Design” formulated by the company. Then fill in “Sheet for Alteration of Engineering Design” after confirmation that the alteration shall not affect the system in technique and report to chief engineer. QC and security inspector shall strictly control quality: when QC and security inspector find any potential danger after their examination of the total construction according to the relevant security regulations and quality standard, they must inform engineering supervisor and order them to re-manage. Meanwhile, ask the party to fill in “ Report on Construction Quality Accident” and Table of Construction security Accident according to the real situation and hand them in to chief engineer and construction unit for examination and file. Chief engineer must formulate plan for construction, plan for progress of construction according to the actual situation at site and submit them to the owner for approval. To assure smooth construction, a chief engineer must consult the owners 35