Download Specifications for Project
Transcript
GENERAL CONDITIONS TABLE OF CONTENTS SECTION 2 – PRE-COMMENCEMENT PHASE Part 1 – Pre-commencement Phase Services 2.1.1 – Pre-commencement Coordination 2.1.2 – Construction Preparation Period 2.1.3 – Construction Management Plan 2.1.4 – Quality Control Program 2.1.5 – Construction Progress Schedule, Overall Project Schedule 2.1.6 – Progress Reports and Information 2.1.7 – Rental Rates and Wage Rates for Change Orders 2.1.8 – Unit Prices Part 2 – Construction Documents and Site Plan 2.2.1 – Contract Documents 2.2.2 – Documents at the Project Site 2.2.3 – Submittals 2.2.4 – Manufacturer’s Recommendations 2.2.5 – Site Plan, Land Disturbance Permits 2.2.6 – Geological and Archaeological Specimens SECTION 3 – CONSTRUCTION PHASE Part 1 – Construction Phase Services 3.1.1 – Basic Construction Services 3.1.2 – Measurements and Dimensions 3.1.3 – Rain Water, Surface Water, and Back-up 3.1.4 – Dust Control 3.1.5 – Cutting, Patching and Fitting 3.1.6 – Space Conditions 3.1.7 – Cleaning Up 3.1.8 – Duty of Contractor to Report Defects 3.1.9 – Duty of Contractor to Report Conflicts Part 2 – Changes to the Work 3.2.1 – Acknowledgement of Existing physical Conditions 3.2.2 – Owner’s Right to Make Changes 3.2.3 – Changes Forbidden without Consent of Owner 3.2.4 – Form and Execution of Change Orders 3.2.5 – All Cost and Time Impacts to be Included 3.2.6 – Changes in Contract Time 3.2.7 – Allowable Costs for Changes to the Work 3.2.8 – Costs Not Allowable for Changes in the Work 3.2.9 – Change Order Formats 3.2.10 – Changes Due to Subsurface or Other Unforeseen Conditions 3.2.11 – Compensable Rock 3.2.12 – Subcontractor Claims for Extended General Conditions Costs 3.2.13 – Release of Claims 3.2.14 – Sole Source Designation for Change Order Work Part 3 – Time. 3.3.1 – Time is of the Essence 3.3.2 – Competent Management of Time 3.3.3 – Contract Time 3.3.4 – Commencement, Prosecution, and Completion 3.3.5 – Construction Progress Schedule (Overall Project Schedule) 3.3.6 – Completion Date 3.3.7 – General Rule – No Damages for Delay 3.3.8 – Exception to General Rule – Compensable Delay 3.3.9 – Non Compensable Delay 3.3.10 – Submission of Claims for Compensable Delay or to Extend the Material Completion and Occupancy Date II SHORT FORM DESIGN-BID-BUILD CONTRACT MARCH 15, 2010