Download Summary:

Transcript
(Step 30) Once above information has been added, cut and paste the following into the text file, in this order:
Only paste the results for the year of interest to avoid future confusion. For example, if calculating 2009
loads, eliminate estimates for 2007 and 2008 (which would have been used as part of the three-year dataset to
develop statistical relationships).
1. Calculate → Loads
2. To calculate time series loads (daily, monthly, calendar) Use 1 Day as Maximum Gap for
Interpolation
i. Calculate → Series → Calendar Year (1 Day as Maximum Gap for Interpolation)
ii. Calculate → Series → Monthly (1 Day as Maximum Gap for Interpolation)
iii. Calculate → Series → Daily (1 Day as Maximum Gap for Interpolation)
Example Notepad Output file:
I:\Assessments\Documents\SOP\SOP_Flux32_Stream_Load_Estimates_V1.2.docxx
18