Download Acceptance Test Report

Transcript
GPROOl-6
Applicable
GPROOl-7
Applicable
GPROOl-8
Applicable
GPROOl-9
Applicable
GPROOI-IO
Applicable
GPROO2-1
Applicable
GPROO3-1
Applicable
GPROO4-1
Applicable
GPROO4-2
Applicable
GPROO4-3
Applicable
GPROO5-1
Applicable
Project Website under the tab "Resources" -> "OBPP Design Documents" All datasheets of components used in the system design are located on the project website
under the tab "Resources" -> " Datasheets" The final report will include a section entitled Firmware Development which will include
documentation of the design
decisions, implementation and
issues with the current firmware
See User's Manual located on
Project Website under the tab
" Project Documents"
See Maintenance Manual on
Project Website under the tab
"Project Documents" Inspection of Project Website. All files to be delivered are in standard and portable docu ment formats . SWROOl-1: Environmental Memo (in the Final Report) will analyze that the syste m meets the
operational and storage
temperatures. In addit ion, RoHS
compliance will be analyzed .
SWROOl-2: EMI/EMC Memo (in
the Final Report) will analyze the
unintentional electromagnetic
radiation concerns of the system
Environmental Memo will analyze
if the system has any hazardous
materials and if they comply with
LC Chemical Hygiene Plan
Environmental Memo will make
sure all materials used in
electronic circuit fabrication are
RoHS compli ant
Environmental M emo will
consider disposal of design or
prototypes
Inspection
~
/
V
/
V
/
K
/
V
~
~