Download VERTICOOL - Curlin, Inc.

Transcript
TKO VertiCool Vertical Leveler Dock Doors
User’s Manual
TABLE OF CONTENTS
LIMITED WARRANTY
1
OWNER’S RESPONSIBILITIES
2
TOOLS & MATERIALS
3
Recommended Anchor System for Hollow Block
3
SAFETY
4
Safety Signal Words
Safety Practices
4
4
SITE PREPARATION
6
Door Opening
Track Mounting Surface
6
6
TRACK ANCHORING APPROVED METHODS
8
Structure
8
TRACK INSTALLATION
9
Lower Track Installation
9
TRACK INSTALLATION
12
Straight Vertical Upper Track Installation
Tilt T1 Upper Track Installation
Tilt T2 Upper Track Installation
14
16
20
Center Spring Pad Installation
24
PANEL INSTALLATION
26
Component Identification
Panel Stacking
Slide Lock Installation
Lintel Seal Installation
26
28
30
30
Decals & Placard Installation
31
SPRING/SHAFT INSTALLATION
35
Component Identification
Single Spring/Single Shaft Assembly
Double Spring/Single Shaft Assembly
Double Spring/Split Shaft Assembly
35
35
37
39
WINDING SPRINGS
41
Secure Door
Install Cables
Wind Springs
41
41
41
DOOR OPERATION
45
PLANNED MAINTENANCE
46
TROUBLE SHOOTING
47
PARTS LISTING
48
Page
ii
© 2012 4Front Engineered Solutions, Inc.
15-00084 R5 08/12 VC