Project Planning The following is a typical program and timetable for a Panel installation project, once the initial order has been received: 1. Project Meeting Installer and user to be present; system specifications, schematic diagram and proposed circuit drawing to be available. Panel Installation & Commissioning Guide to be provided. 2. Equipment Fix Typically 2 week's notice is required for equipment to be delivered. Cable to be installed and bases/back boxes to be fitted. Then fire detectors, call points, alarm sounders, isolator units and interface units to be installed. 3. Address Schedule Schedule of sensor locations to be completed by installer and returned to enable System programming. 4. Auto Learn Fire panel/repeater panels to be installed and terminated. System to be powered up by installer and auto learn mode activated (see Auto Learn section). System to be tested and verified by installer, prior to final commissioning. 5. Final Commissioning Minimum 2 weeks notice is required from receipt of Address Schedule and Commission request form. Cooper Lighting Service Engineer to attend site implement/oversee the final commissioning procedures (see Commissioning section), in conjunction with the installer. 8