Download Berner International Maxair Specifications
Transcript
MAXAIR GUIDE SPECIFICATIONS 3.6 CLEANING A. Clean air door prior to commissioning. B. Repair or repaint damage to finishes on exposed-to-view surfaces. 3.7 SYSTEM STARTUP Specifier Note: Retain optional text in paragraph below if required for a specific project. A. 3.8 A. Test and operate air doors to ensure that they perform as intended. Adjust discharge nozzles to deflect air outward [unless otherwise required]. DEMONSTRATION Demonstrate for Owner’s maintenance personnel how to adjust, operate, and maintain air curtains. END OF SECTION © 2010 Berner International Corporation. All Rights Reserved. A copyright license to reproduce this specification is hereby granted to non-manufacturing engineers, architects and specification writers. Revd 03/11 Project Name Project Location Project No. 23 34 33-10 Date Air Doors