Routing Ponds One of the most common requirements for post-development storm water management is that the post-development discharges not exceed the pre-development discharges for one or more storm frequencies. The detention basin is generally the least expensive and most reliable measure for controlling post-development peak discharges. To begin the process of designing a detention pond, start by calculating the post-development runoff using one of the runoff calculation methods. The hydrograph of the post-development runoff flow is called the inflow hydrograph because it represents the flow rate of water entering the detention pond. Using this inflow hydrograph (and other runoff data), you can calculate the required storage volume for a pond. In addition, you can generate the outflow hydrograph that represents the flow rate of water exiting the detention pond. This process of calculating the outflow hydrograph for a detention basin based on the inflow is called routing. Key Concepts ■ ■ 148 | The program provides two commands to calculate routing data. Use the Detention Basin Storage command to calculate the required storage volume for a pond, and use the Storage Indication method command to calculate a routed hydrograph. You can create the routed hydrograph for the detention pond by using the Storage Indication Method. This command uses a post-development hydrograph, stage-storage curve, and stage-discharge curve (as well as an optional pre-development hydrograph for viewing in the multiple hydrographs plot) to route runoff. Chapter 10 Hydrology and Hydraulics