Download AND EJ-120 User`s manual
Transcript
ii 5. Installing Impulse Piping.......................................................................... 5-1 5.1 5.2 6. 5.1.1 Connecting Impulse Piping to a Transmitter....................................... 5-1 5.1.2 Routing the Impulse Piping................................................................. 5-3 Impulse Piping Connection Examples............................................................ 5-4 Wiring.......................................................................................................... 6-1 6.1 Wiring Precautions............................................................................................ 6-1 6.2 Selecting the Wiring Materials.......................................................................... 6-1 6.3 Connections of External Wiring to Terminal Box........................................... 6-1 6.4 7. Impulse Piping Installation Precautions......................................................... 5-1 6.3.1 Power Supply Wiring Connection....................................................... 6-1 6.3.2 External Indicator Connection............................................................ 6-2 6.3.3 Communicator Connection................................................................. 6-2 6.3.4 Check Meter Connection.................................................................... 6-2 6.3.5 Status Output Connection................................................................... 6-3 Wiring.................................................................................................................. 6-3 6.4.1 Loop Configuration............................................................................. 6-3 6.4.2 Wiring Installation................................................................................ 6-4 6.5 Grounding........................................................................................................... 6-5 6.6 Power Supply Voltage and Load Resistance.................................................. 6-5 Operation.................................................................................................... 7-1 7.1 Preparation for Starting Operation.................................................................. 7-1 7.2 Zero Point Adjustment...................................................................................... 7-3 7.2.1 Adjusting Zero Point for Differential Pressure Transmitters............... 7-3 7.2.2 Adjusting Zero Point for Gauge/Absolute Pressure Transmitters .... 7-3 7.3 Starting Operation............................................................................................. 7-4 7.4 Shutting Down the Transmitter........................................................................ 7-4 7.5 Venting or Draining Transmitter Pressure-detector Section........................ 7-5 7.6 7.5.1 Draining Condensate.......................................................................... 7-5 7.5.2 Venting Gas........................................................................................ 7-5 Local Parameter Setting.................................................................................... 7-5 7.6.1 Local Parameter Setting (LPS) Overview........................................... 7-6 7.6.2 Activating Local Parameter Setting.................................................... 7-7 7.6.3 Parameter Setting Review.................................................................. 7-7 7.6.4 Tag Number Configuration.................................................................. 7-8 7.6.5 Pressure Unit Configuration............................................................... 7-8 7.6.6 Pressure LRV/URV Configuration...................................................... 7-8 7.6.7 Damping Time Constant Configuration.............................................. 7-9 7.6.8 Output Mode Configuration................................................................ 7-9 7.6.9 Display Out 1 Configuration................................................................ 7-9 7.6.10 Re-range by applying actual pressure (LRV/URV)............................. 7-9 7.6.11 Save or Cancel................................................................................. 7-10 7.6.12 Abort Configuration........................................................................... 7-10 IM 01C25B01-01E