Download Worcester 30i System Compact Technical data
Transcript
BBT1253 G_CDi Rg+Sys TS c08_07 25/6/07 09:21 Page 14 Greenstar CDi Conventional Compartment installation Condensate termination and route External condensate pipework The appliance may be installed in any room, although The condensate connection on Worcester appliances is in All Worcester condensing boilers have within a syphonic particular attention is drawn to the requirements of the IEE 22mm plastic. The pipe should be extended and directed condensate trap. Rather than the condensate constantly A Flow 22mm regulations applicable and in Scotland the electrical away from the appliance with a constant minimum fall of dripping into the discharge pipe, the condensate is B Gas inlet 22mm collected into a trap which releases it in 100ml quantities. C Return 22mm provisions with respect to installation in a room containing 3 degrees or 50mm in every metre. a bath or shower. Pipework connections This will help prevent freezing occurring. The condensate pipe can terminate into any one of five areas: • The room in which the appliance is installed does not Wherever possible the condensate discharge pipework require a purpose provided air vent. should be routed and terminated internally. Should this not A B C be possible, and the only available route is external, the • If the appliance is installed in a cupboard or compartment following conditions should be observed: Greenstar CDi System with dimensions that allow the minimum clearances • The pipework length should be kept to a minimum and shown in the siting of appliance section above, then no Wall preparation Pipework connections the route as vertical as possible ventilation is required. Internal sink/ washing machine drain Internal waste drainage system • Where pipework could be subjected to extreme cold or A Flow 22mm B Gas inlet 22mm C Return 22mm wind chill, a weather proof insulation should be used. The drawing shows the new CDi wall mounting jig which Alternatively, the condensate pipework could be enables a simple and straightforward method of attaching increased to a minimum 32mm without the requirement the boiler to the wall surface. The new wall mounting to insulate. A B C jig has additional optional fixing points and provides improved engagement. After fixing the jig to the wall, the appliance can be lifted Pipework connections and casing dimensions Soil and vent stack External drainage system Cabinet dimensions (mm) C onto the jig and the union connections tightened. The A 750* pipework can be routed behind the boiler without the B 440 C 360 need for an additional wall spacing frame. *760mm to top of casing front. A External condensate absorption point (unsuitable for clay soil types) A Condensate from boiler syphon/trap B Sink with integral overflow G 300mm x 100mm dia sealed plastic tube C 22mm dia plastic condensate pipe H Ground level D External drain or gully J Drainage holes 50mm facing away from building E Internal soil and vent stack F Serviceable condensate trap (75mm min.) B K Limestone chippings L Weather resistant insulation Condensate disposal Whilst all of the above methods are acceptable it is always All condensing boilers generate condensate discharge the best practise to terminate the condensate pipe via an which needs to be piped away from the appliance via a internal waste system. This will eliminate the need for any plastic pipe. external condensate pipe runs which can be susceptible to freezing in extreme weather. Best practise is not to run The amount of condensate generated depends on the external condensate pipe any further than 3m. If it is efficiency and operating status of the appliance. This can necessary to run more than 3m externally increase pipe size be up to 2 litres of condensate water an hour. to 32mm. 14 15