Download Siemens ET 757 E Series Operating instructions
Transcript
Commissioning and optimization (software) 7.1 7 Commissioning sequence The sequence in which the software of a frequency converter in an ET 200 station is commissioned depends on how complex the drive application is, and on the automation structure. The basic drive functions and the higher-level controller are commissioned first and are then specialized, optimized and the drive application generated. The parameters and settings that are located during this process can be used for standard commissioning, if required. Requirements A prerequisite for software commissioning is functional hardware that has been commissioned according to the chapter entitled "Commissioning (hardware)". A drive configuration has been generated for the converter and the motor has been commissioned with the factory settings. Procedure 1. First commissioning and optimization – Frequency converter/motor combination – Drive application – Communication between the S7 CPU and frequency converter – Fail-safe functions 2. Standard commissioning Transferring the parameters and settings to other frequency converters ET 200pro FC Operating Instructions, 11/2007, A5E01100763B AA 83