Download Automate 425 Instruction manual
Transcript
SM425 INSTRUCTION MANUAL 4.0 PIPING Mount a check valve or stop valve (specified by Teledyne Monitor Labs) on the nipple (found on the open market) at the calibration gas inlet of the detector as illustrated in Figure 4-8. (The check valve or the stop valve may have been mounted on the detector when shipped.) Connect the flow setting unit and the detector to a stainless steel pipe 6 mm (O.D.) ~ 4 mm or larger (I.D.) (or nominal size 1/4 inch). Figure 4-8 Piping for the Calibration Gas Inlet 4.2.3 Piping for the Reference Gas Reference gas piping is required between the air source (instrument air) and the flow setting unit. Also between the flow setting unit and the detector. Install an air-set (pressure regulator) in the piping between the air source and the flow setting unit. The air-set (pressure regulator) should be close to the flow setting unit. Use a 6 mm (O.D.) ~ 4 mm or larger (I.D.) (or nominal size 1/4 inch) stainless steel pipe between the flow setting unit and the detector. 4.2.4 Piping to the High-temperature Probe Adapter Refer to Section 1.18.4. 4.3 Piping for System 3 Piping in System 3 is illustrated in Figure 4-10. In System 3, calibration is automated. The piping is basically the same as that of System 2. Refer to Section 1.19. Adjust secondary pressure of both the air-set (pressure regulator) and the zero-gas reducing valve such that these two pressures are approximately the same. The flow rate of zero and span gases (normally instrument air) are set by a single needle valve. After installation and wiring, verify the calibration contact output (see Sec. 7.11.2), and adjust zero gas reducing valve and calibration gas needle valve so that zero-gas flow is within the permitted range. Next 74 42500001 REV A