Download Electrode Steam Humidifier Manual
Transcript
5.8 Condensate Hose Note: When installing the condensate hose, please pay attention to the following: Warning: To keep condensate from accumulating in the duct, make sure condensate can drain freely. If the steam manifold is positioned higher than 500 mm above the steam humidifier: » Remove the condensate plug (12) from the connection fitting on the cylinde. » Lay the condensate hose at an approximate incline of 5-10% to the steam cylinder connection fitting, to allow the condensate to drain freely. Note: It is recommended to form a loop of 200 mm diameter as a vapour trap provided there is enough space. Possible operating noises can be reduced in this manner. If the steam manifold is positioned lower than 500 mm above the steam humidifier: » The condensate must be drained separately. » To prevent steam loss, lay a loop at least 200 mm in diameter. » To ensure condensate drainage, place the loop (vapor trap) as far away as possible below the steam manifold connection. » The condensate connection on the steam cylinder must be closed with a sealing cap. » Place hose clamps at intervals of at least 500 mm, depending on how the hose is laid. 5.9 Types of Installation If the steam manifold is positioned higher than 500 mm above the steam humidifier: » Lay the steam hose at a height of at least 400 mm above unit and then connect to the steam manifold with a constant rise or fall. » Lay condensate hose with a slope to the steam cylinder. Page 30