Download DT SYSTEM USER MANUAL
Transcript
DT SYSTEM USER MANUAL 10/11/2009 9.1.1. YB-2 ROS status page http://vmepcs2g16-06.cms:40000/urn:xdaq-application:lid=11/ 9.1.2. YB-1 ROS status page http://vmepcs2g16-07.cms:40000/urn:xdaq-application:lid=11/ 9.1.3. YB0 ROS status page http://vmepcs2g16-08.cms:40000/urn:xdaq-application:lid=11/ 9.1.4. YB+1 ROS status page http://vmepcs2g16-09.cms:40000/urn:xdaq-application:lid=11/ 9.1.5. YB+2 ROS status page http://vmepcs2g16-10.cms:40000/urn:xdaq-application:lid=11/ 9.2. If anything appears in yellow (and it is not expected, see Monitoring section) log the info in the e-log and contact an expert. In order to provide information about the error, specify the wheel, the sector, the information about the type of error (“Ceros3 Chanels Timed Out”, etc) and the hexadecimal code that appears in yellow 9.3. Open another tab to connect to the DDU status page http://vmepcs2g18-16.cms:40000/urn:xdaqapplication:lid=11/ (NOTE: These last pages will only be active when the Global DAQ is running. If running and don´t appear directly, you should click on “RU”, then on the CMS wheel picture on the right and then select “Status” and “Show” of what corresponds. (FED = DDU) 10. DTTF: 10.1. It is configured through the Trigger Supervisor, so usually you don´t need to do anything. In case of problems, once you have checked the trigger monitor (see 5), contact the DTTF experts. 11. RUN THE DQM (Instructions at https://twiki.cern.ch/twiki//bin/view/CMS/DTDQM) 11.1. In the firefox window click on the bookmark Central Global DQM Online: http://srv-c2d05-19:8030/dqm/online (from cms network) 11.2. There you can check the status of the present run and also of previous ones. 11.3. You can also check the central online DQM from outside the cms network on: https://cmsweb.cern.ch/dqm/online/session/QpBuQQ 11.4. If central DQM is not working, you can use the DT private DQM (it also has more plots) in: http://srv-c2d05-13.cms:8888/dqm/devtest/ For information about the meaning of the different plots, refer to https://twiki.cern.ch/twiki/bin/view/CMS/DTDQMPlots 12. MONITOR all the relevant information (see Monitoring section below). 13. SWITCH OFF THE SYSTEM: 13.1. This only needs to be done when the Global run is over and nobody is going to remain watching out the system. At present, it cannot be left unattended. 13.2. Power off the TSC boards mezzanines https://twiki.cern.ch/twiki/bin/view/CMS/DTshiftFAQ2009x07x31 13.3. Stop the minicrate DCS if it was running (Make a DCS reset and click on DCS/Exit). 13.4. Switch off the LV of the minicrates ((DT_detector page Click on the left upper buttons (second column, the coloured ones and “Switch off LV”). 13.5. Switch off the LV of the sector collector crate(s) in the DT_detector page/MAOs Status button. 13.6. Switch off the 48 V Power Easy Crates (MAOs) in the DT_detector page/MAOs Status button. We recommend to switch OFF one by one the MAOs at present, it is faster. 15