Download Solex Roofing Installation Manual
Transcript
Solex Roofing Installation Manual 25 IF A PATCH OF ROOF IS BEING COVERED JUMP TO 21 17. Eaves – the eaves will overhang the first batten by 90mm 18. Verge – If the roof runs from one verge to another it is an advantage to design the roof to fit an exact number of slates, to the nearest half slate, using the slating interval given. The slates should be finished with a dry fit verge system, as recommended by Nu-lok. If running out to a second verge, which does not fit to the nearest ½ slate, polycarbonate slates will need to be cut to fit. 19. Ridge – the battens should be gauged out so that a full course is present at the ridge. Finish with a dry fix ridge. 20. Hip – polycarbonate slates are cut to size for use at a hip. Refer to the Nu-lok installation guide to see details of installation at hips. It is not recommended that a mitred finish is used with polycarbonate slates. 21. Valley – polycarbonate slates are used up the edge of a valley. Again, refer to the Nu-lok guide for more valleys details. IF A WHOLE ROOF IS BEING COVERED SKIP 21 AND 22 22. Slating a patch – a patch of Nu-lok solar slates may be installed surrounded by compatible Nu-lok natural (300 x 400) or ceramic (400 x 400) slates. Due to the unique nature of the Nu-lok system, it is possible to achieve a straight vertical join between the different materials as the link channels make the joins weatherproof. Use verge slates (600x400mm) to obtain the straight line with the glass slates, and cut the natural or ceramic slates to match. 23. Slating a strip – when installing the solar slates into a roof covered with an incompatible material – e.g. clay tiles – the easiest method is to install the solar slates as a strip. This method is the most suitable for retrofit situations, as the existing roof can be stripped off from the top down. If the conventional tiles or slates are considerably thicker than the solar slates, the solar area will need to be raised. As a counterbatten is required anyway, this may go part of the way to achieving this extra height. Any extra height may be provided by thicker spacing battens, or thicker counterbattens with thicker insulation between them. The top of the insulation should still be flush with the tops of the counterbattens. At the bottom of the strip the glass slates will lap over the existing material. Usually a strip of lead flashing 150-200mm Solex Energy Ltd +44(0)1305 837223 www.solexenergy.co.uk