CLARIFICATION DEVICE FOR HUMIDIFICATION PAN1)
1.3
Preparation for initial operation
•
Open the front flap
•
Attach on-site hose to outlet connection (1) (overflow and condensate drain) and secure with hose clamp → Fig. 1-1 Connection for onsite hose
•
Connect hose to a floor outlet
Fig. 1-1
Connection for on-site hose
WARNING
Betriebsanleitung für Klimaprüfschränke
A-abschl.fm 64609956 GB 03.2003
The overflow and condensate drain must be connected to a floor
outlet
2–4
1) option
2) not assigned
3) only for test systems with 600 ltr and more