Download Baxi 100 HE Plus Quick Start Manual
Transcript
11.0 11.1 Fitting the Outer Case Fitting The Outer Case 1. Fit the outercase to the appliance ensuring that the four slots in the side flanges align with the hooks on the chassis (Fig. 38). 2. Insert the two fixing screws into the sides of the chassis (Fig. 39). 3. Close the lower door panel against the retaining magnets (Fig. 39). 4. Instruct the user in the operation of the boiler controls. Hand over both the Users Operating and Installation and Servicing Instructions, giving advice on the necessity of regular servicing. 5. Advise the user that a plume of vapour from the flue terminal is normal, and that there is no need for concern. User Label 6. Advise the user that if intelligent pre-heat is on, preheating will not occur for the first week of operation. 7. Set the User preferences. See User Label on lower door panel (Fig. 38) or user’s operating instructions (set CH/DHW temperatures). Fig. 38 8. Carefully read and complete all sections of the Benchmark Commissioning Checklist at the rear of this publication that are relevant to the appliance and installation. These details will be required in the event of any warranty work. The publication must be handed to the User for safe keeping and each subsequent regular service visit recorded. Lower Door Panel 9. For IE, it is necessary to complete a “Declaration of Conformity” to indicate compliance to I.S. 813. An example of this is given in I.S. 813 “Domestic Gas Installations”. This is in addition to the Benchmark Commissioning Checklist. Outercase Fixing Screws Lower Door Panel Retaining Magnet Fig. 39 © Baxi Heating UK Limited 2005 35