Download Power Exchange Code User Guide Draft
Transcript
How Are Imports/ Exports Handled? 14.2. Units in Foreign Countries Entities with generating Units located in another country may import energy into Greece for the purposes of supplying customers. In order to import energy across an interconnector the entity must be an Authorised Supplier and meet the required technical requirements to import energy to Greece. In particular, the entity must: • hold rights to use interconnector capacity into Greece (the methods by which Participants may obtain rights to use interconnector capacity into Greece are outside of the STA); and • arrange with system operators outside of Greece for the delivery of energy from its units to Greece. To import energy into Greece from a Unit outside of Greece a Participant must submit a Daily Offer for the Unit by 12:00 of the day prior to the Dispatch Day, just as it would if the Unit was located in Greece. However, the Daily Offer must be: • made in accordance with the Participant’s rights to use an interconnector; and • made in accordance with the Participant’s rights to transmit energy from the Unit to the interconnector. The only difference between an Offer made in respect of a Unit located outside of Greece and a Unit located in Greece is that there is no Offer price restriction on Units located outside Greece. This is in view of the practical difficulties of auditing the costs of generating plants located in foreign countries. 14.3. Scheduled Interconnector Flows Offers in respect of Units in foreign countries and valid export nominations are taken into account in both the unconstrained forecast generation schedule and the constrained forecast generation schedule. Offers in respect of Units in foreign countries that are accepted in the constrained forecast generation schedule and all valid export nominations are accepted by the HTSO and aggregated into a single scheduled interconnector flow for each hour for each interconnector so long as: • the net scheduled quantity represents a feasible flow on the interconnector with respect to its available transfer capacity, as determined by the HTSO after taking into account the HTSO’s need to reserve some portion of the capacity of the interconnector to meet its system security obligations; 63