Download Installation Manual
Transcript
Exsulite™ Thermal Facade System Wall cladding solutions for certifiers & builders How does a Cavity System work? AcraTex - is a pioneer in the use of EIFS systems, designing and installing systems specifically for Insulation benefits as originally used in Europe. In recent years the use of Lightweight Cladding Systems, as Alternate Solutions in the BCA, has grown but proper system design and installation has not followed. The BCA requires appropriate design and installation controls to qualify any Alternate Solution and ultimate success requires a total systems approach integrating Design, Componentry & Installation. The Exsulite™ Thermal Facade system protects surveyors, builders and their Clients from the risks of mixed componentry and uncontrolled installation. Exsulite™ by Dulux® AcraTex® offers a Single Supply Source for the Total Facade System - Cladding to Weatherproofing Coating The Exsulite™ Thermal Facade Cavity System is recommended in areas with significant variation between internal and external temperatures. If condensation occurs, moisture can efficiently drain from the cavity through the specially designed starter beads and provide airflow throughout the entire cavity. Exsulite™ EPS Panel The four key elements of a cavity & moisture management system. ® Exsulite™ Thermal M-Grade Panels can be cut to any desired thickness but dependant on application and required “R” value we recommend from a range of standard panels; 60mm, 75mm, 100mm. The sheet dimensions are 2500mm x 1200mm and are manufactured to meet the requirements of AS 1366.3 – 1992. The cavity separates the cladding material from the timber framing. It protects the timber framing from any occasional leaking by providing a gap allowing water to drain down the back of the cladding and out through the base of the cavity. Any remaining moisture within the cavity is able to dry through ventilation provided along the bottom edge of the cavity. •D eflection: The first line of defence is a well designed and constructed cladding system to ‘deflect’ the water away. •D rainage: A cavity provides a second line of defence by ‘draining’ away water that may leak behind the cladding. •D rying: By ventilating the cavity, any moisture that has not drained away is removed by ‘drying’. •D urability: Materials for wall and cavity construction must be sufficiently ‘durable’ to resist decay for a period that will allow time for a leak to be discovered and repaired. Dulux® Exsulite™ Trained Installer Network An Exsulite™ Certificate of Installation from a registered Exsulite™ Installer provides peace of mind that “as built” meets Design Specification. All Exsulite™ Trained Installers can be verified by their Exsulite™ Identification Card and Registration number. Project QA Process is a critical element of the Exsulite™ Total System approach and the Exsulite™ Installer Network ensures Total Facade System compliance From Start to Finish. Install Finish er Ch ecklis Appli aroun ed PU se Back overc d wind alant blockin to memb oat se ows, me expa g req uired rane alant wi ter bo nsion check and if ) th Ba x an joints, Exter ed exp so by co nal seco d oth ansion who. PVc Vertica at or er pe ntrol joi joint TM Protec angle locatio nts, Textur netra expans l expansion ns and tive s ins e. Ov tions. and s ions drop talled ensure joints joints inst ercoa (Do no shee d dou and alle at ma Exsul check t t on ts to ble stud by wh x. 3.0 d at ma ite Ba Yes ed gab ly wi roof x. 6.0 s. m cen o. th se co le are and m tres centres a fram . at ap adjac Exsul Backing ing at and hor ite me plied No ent plates 600m 10izo areas . for fixin sh 0mnta m ma l m, dia embe . g of dow x. cen Backing comm Gree tres. gona dded n pip plates ents: Yes n Re e bra l strips into to clo ba cke ba se co nder thes line ts bef check at co seco ore pan Yes at ap Seale ed flas s, per rners at, ov No el inst golas plica r (whe hing of op erlap Da alla ove and AcraTtion. tion). te: n tex r roo ening ped check other f areas, ture ex tex By W min. No externa ed win s. comm coati parape ture ho dows l fixtu ng en res. co ts: withi at ap Dampas a Qualityand The Exsulite “certificate of installation” is for use by a Exsulite Trained & Registered installer control doors Documenttstoand bal n5 proof plied conies. AcraT inst days courseprocedures asalle ex M Yes . d wit certify that the specified Exsulite system has been installed in accordance with the Exsulite installation set out in Ba of h cor installe embra tch Exsulite rect rev No: d to Appli ne top breath slab eal size the Exsulite installation manual & Dulux AcraTex specification. No rebate able coat produtoedsuitin ac Yes absorb . if not appli ct sp cavco ent wa , stat ed. comm ecificity.rdanc e alte Finish Date: The “certificate of installation” is used to record on site work procedures & substrate standards for installationll wra of pthe rnathe ation e with ents: er sig Qua tive bre installe No Exsulite s AcraT ntity d. Name athabl n-off Date: Produ ca& Exsulite Thermal Facade System and the Application of AcraTex finishing system, signed off over atejob (bags ex pro vityhanded wrapcompletion. : ct: spacer ): installe duct if not installe Date: d. data , type d. shee of cav for warranty The Exsulite “certificate of installation” and Exsulite Warranty Job Registration forms are required purposes and Batch Produ ts an ity spa d Exsulite ct: cercan No: Instal installe forms part of the Exsulite warranty procedure. The Exsulite Trained installer and Exsulite Trained Finisher either be the same panel comm colou ler No d and thickne r: ents: by Exs Ye : ss inst who. ulite or separate entities who have attended the Exsulite Training course . s Batch alled. and ma screws and No: ximum Qua colou washe No ntity 600m rs Appro r: Signa m hor installed (buck ved alu comm at ma izonta openin ture: ets): comm ximum lly. ents: gs and minium flas cavity ents: 275m Qua hing all pen spacer m ver ntity Exsulite Project Start Date etration tape inst thickne tically (buck alled panels comm s. ss Type ets): around 60mm glued ents: window fully alo All exp Site Address 75mm s, doo ng abu osed mm panel rs, me tting edges edges ter box 100mm Exsulite Project Builder contact Number with fully enc , PVc approv mm Other losed externa ed foa with l ang Date m adh PVc contro les fixe contact Name channe esive. of co l Joints d wit l. mplet to ma h app sonry ion: roved Exsulite with 8m Ground Level construction adhesiv Exsulite Hebel Brick panel Other m gap e. to win and bac dow Detail king rod sills cut Upper Level construction at con Exsulite Hebel Brick /strip. at min crete Other imum slab All com 10 deg rebate ponent Exsulite Panel Wall Area m2 Dulux Specification Number Ma in acc rees. s hav nual ord e bee and co ance with nstructi n installe collec Exsulite d fully on Det ted all co in acc ails. nstructi off cuts ordanc on det Installe and pla e wit ails. r sign-o h Exs ced in ulite ff clear installa Na company Name installer me: Name plastic tion bags for rec Exsulite installer No. ycling collec Installe Nominated installer Mobile tion. r No : Nominated installer No er Chec klist (co ntinued t ) Yes No Comm ents/B y Who Certificate of Installation Proje ct Sp ecifi Item c Ch /Des ecklis cripti t on Project Information • Installer Training and Ongoing Development Yes Exsulite Trained Installer Entity • Registration and Verification ID Other Exsulite Trained Finisher Entity No Com men men ts Signat ure: company Name • Certificate of Installation checklist and QA sign-off Com installer Name Exsulite installer No. Date Nominated installer Mobile of com pletion Nominated Finisher No Site Access and Scaffolding Checklist Yes is all access scaffolding set up to install the specified system? 5412 Installer Checklist /0712 is all scaffolding and access equipment checked and approved? All Exsulite components supplied by Dulux with no substitution. checked frame with straight edge up to 5mm tolerance. 5412/0712 Was rectification required and if so by whom? checked frame for additional back blocking to ensure double studs at vertical butt joints to panels. Yes No Comments/By Who On co by em mpletio ail to n of th is sale s@ex form, it is sulit e.com the resp No Comments/By Who .au or onsi by fa bility of x to +61 the Exsu lit 3 92 63 58 e Traine 40 as d Inst part aller to of jo b regi forward it stra tion to Dulu Page 1 of 3 proc ess. x AcraTe x Page Exsulite Installation Manual - Page 5 2 of 3 Page 3 of 3 ts/By Who