Download SMC IMU User Guide - Ship Motion Control
Transcript
3 STORAGE AND UNPACKING Unpack the equipment and remove all the packaging materials and shipping carton. The motion sensor is delivered in a transit case designed to protect it from high shocks during transit. When the unit has been received it should be inspected for damage during shipment. If damage has occurred during transit, all the shipping cartons and packaging materials should be stored for further investigation. If damage is visible a claim for shipping damage should be filed immediately. Because of the sensitive nature of the IMU the package must not be dropped. Standard Delivered Items • • • • • IMU Transit Case Junction Box Fitted with IMU to JB 10m 12 core cable Serial Output Data lead 1.5m AC Input Cable 0.9m Calibration Certificate CD with IMU Configuration Software and IMU User Manual SMC IMU User Guide v23.docx Index SMC Ship Motion Control 6