Download MANUAL DEL OPERADOR A2000T

Transcript
DELIVERY OF THE MACHINE
The machine must be checked immediately upon delivery to ensure that it is
complete with all its components; should not be the case, the manufacturer
and/or its representative must be notified at once.
The sprayer is normally supplied either wrapped with nylon or packed in a carton
and all the components are appropriately protected for shipment. In order to save
space and reducing risks of damages during transportation, some parts may be
supplied loose and need to be reassembled before using the machine. In this
case follow these instructions:
•
•
•
•
Mount the pressure regulator on it’s support
Mount the delivery and bypass hoses
Check that all the hoses are tight
Connect the hoses of the nozzles and of the handgun (if supplied)
Run the sprayer, for the first time, with fresh water, to check that everything
operates properly.
HOW OPERATING WITH A NEW MACHINE
a. Inspect for loose or missing parts and possible damages.
b. Make sure all fittings and drive components are secure.
c. Lubricate the parts that need to. See Lubrication Section for details.
d. Check tank for any foreign objects.
e. Fill tank ½ full with clean water. DO NOT add and spray chemicals until
the sprayer is started, adjusted and calibrated.
rev. 03/04/2009
15