Download Service Manual

Transcript
SHIFTER HOUSING ASSEMBLY
MODELS:
AMO/APO1000-4 & 1750-4
1. Install poppet spring and poppet. Assemble 3rd-4th speed
shift rail is assembled to the shifter housing through the front
seal and bore. The small stop sleeve and 3rd-4th speed shift
forks are placed on the rail. The long hub of the fork going to
the rear.
2. Slide the long stop sleeve on the shift rail behind the fork.
3. Align the set screw hole of the shift rail with the set screw
hole of the fork. Secure the fork to the rail with the set screw.
Torque the set screw to 40-50 lb. ft.
4. Drop the interlock into the interlock and poppet cross hole
of the front boss. Make sure interlock seats in neutral notch of
the shift rail. Secure with the poppet hole plug.
5. Assemble the 1st-2nd speed shift rail and fork to the
housing. The long hub of the fork goes to the front. The long
stop sleeve to the front and the short stop sleeve to the rear of
the fork.
6. Align the set screw hole of the rail with the set screw hole of
the fork. Secure the fork to the shift rail with the set screw.
Torque the set screw to 40-50 IDS. Ft.
7. Assemble the poppet ball and poppet spring into the
access hole of the housing. Secure with the poppet hole plug.
Check the shifting of both rails in and out of their neutral
position to make sure they travel freely and completely into all
shift positions.
17
tech
Techline
line800-401-9866
800-401-9866
www.ttcautomotive.com