Download I. INTRODUCTION CONGRATULATIONS! You

Transcript
No screw in track.
- Check inside drum to assure adequate
supply of screw (minimum of 100).
- Be sure drum is turning (see above).
Figure 26.
Pump screwdriver manually to
engage air-screw ejector and clear
jammed screws at qualification
block.
- Pull drum face cover outwards and
check upper track (above the
qualifying block) for screw jam. Pump
driver jaw manually several times to
engage air ejector system and clear off
jammed screw (Figure 26). If jam still
exists, clear out manually with fingers
or narrow screwdriver tip or blade
between track members. NOTE - on
most models air ejectors engage only
when driver jaws are activated and
released. On units with axle cam
operated timers the drum must be
turning to activate blow-off, while
with solid-state electro-pneumatic
timers, the electric "on" switch must be
activated.
- Check screw size to assure that correct
screw were loaded in drum. Discard all
improperly sized screws or foreign
material.
- Allow at least 5-10 seconds for screws
to begin filling track after jam is
cleared. Let track fill completely
before beginning to drive screws.
Remember that, on most models, each
time the jaws are activated and
released, the upper tack area will be
cleared of screws by the ejector
system.